Before buying land in Abdasa — around Naliya, Jakhau and the coastal cement belt — the first check is whether the parcel lies inside the 740 sq km Great Indian Bustard priority area set by the Supreme Court on 19 December 2025, where new wind turbines, solar plants above 2 MW and new high-voltage overhead lines are not allowed. Outside that area, Abdasa and neighbouring Lakhpat attract farmland buyers and demand tied to cement, limestone, bentonite and lignite, helped by new broad-gauge rail towards Jakhau and Lakhpat.

Facts last reviewed on

The 19 December 2025 bustard ruling and what it restricts

The grasslands around Naliya are the last place in Gujarat where the Great Indian Bustard is found — a handful of birds, all or nearly all female. To protect it, the Supreme Court’s judgment of 19 December 2025 (W.P.(C) 838/2019) replaced its blanket 2021 order with “Revised Priority Areas”. Gujarat’s priority area is 740 sq km (Rajasthan’s is 14,013 sq km). Inside it:

  • No new wind turbines.
  • No solar plants above 2 MW.
  • No new overhead power lines, except local distribution lines of 11 kV and below.
  • No expansion of existing renewable-energy projects.
  • Specified 33/66 kV and higher lines in Gujarat are to be put underground or rerouted, on timelines running to 2028.
  • Future high-voltage lines are to use dedicated corridors.

In January 2026 the Ministry of Power classed approval delays for transmission lines in bustard zones as force majeure, which tells you how seriously developers take these limits. The tiny Kutch Bustard Sanctuary at Lala–Parjan near Jakhau and Naliya (about 2.03 sq km, declared in 1992 and India’s smallest sanctuary) is a separate, older protection.

We do not say which villages are inside

We have not seen a village-level or survey-level map of Gujarat’s 740 sq km priority area, so we do not tell anyone that a particular village or survey number is inside or outside it. Until the boundary is checked against the judgment’s annexure or confirmed by the Forest Department, treat every Abdasa parcel meant for wind, solar or a transmission line as unconfirmed.

How to test a parcel against the priority area

  1. 1

    Fix the parcel’s exact location

    Get the survey number, the village map and the DILR measurement sheet, and turn the boundary into coordinates. Records are on AnyROR.

  2. 2

    Compare it with the judgment’s maps

    Overlay the coordinates on the priority-area maps annexed to the 19 December 2025 judgment, using a surveyor who can work with GIS files.

  3. 3

    Ask the Forest Department in writing

    A written reply on whether the parcel is inside the priority area or near the Kutch Bustard Sanctuary carries far more weight than a broker’s assurance.

  4. 4

    Trace the power route, not just the plot

    Even a plot outside the area may need an evacuation line that crosses it. Check where the nearest substation is and how a line would reach it.

  5. 5

    Make it a condition of the deal

    For energy projects, tie payment to a clear result, and keep the farmland option open if the answer is unfavourable.

Our solar land hub covers project-land checks elsewhere in Kutch, where these limits do not apply.

Naliya, Jakhau and a cyclone-exposed coast

Naliya is Abdasa’s taluka headquarters (11,415 people in 2011, PIN 370655), with an Indian Air Force station and NH 41 running through it towards Narayan Sarovar. Jakhau, on Godia Creek, is a Gujarat Maritime Board fair-weather lighterage port that closes in the monsoon and a major fishing harbour, with about 522 registered boats in 2023. It is one of three pilot “Blue Harbours”, which supports fish-handling, cold-chain and boat-service land near the harbour.

Naliya is a village, not a town: the 2011 Census records 133 villages and no statutory town in Abdasa taluka, so there is no municipality here and NA permission runs through the Collector. Rail reached it in stages — Bhuj to Deshalpar in 2018 and the full broad-gauge line in 2024, with a separate Naliya Cantonment station — but the approved 24.88 km Naliya–Jakhau Port line had no reported construction start by October 2026. The larger villages nearby include Kothara (about 5,670), Jakhau (about 5,369) and Lala (about 1,342), beside the bustard sanctuary. Land close to the Air Force station can carry height and other restrictions, so check locally before planning a tall structure or mast.

This coast takes the weather head-on: Cyclone Biparjoy made landfall near Jakhau on 15 June 2023, with winds of 115–125 km/h gusting to 140. Coastal and creek-side parcels also fall under CRZ rules, so get a High Tide Line demarcation before buying near the shore.

Approximate distances (check routes on a map)
RouteApprox. distance
Naliya – Bhuj90–100 km
Naliya – Jakhau village17–19 km
Naliya – Jakhau Port30–39 km
Jakhau Port – Bhuj120–125 km

Vayor, Sanghipuram and Sewagram: the cement belt and its new railway

Abdasa’s industrial land story is concentrated on the coast west of Naliya, around Vayor (about 4,027 people in 2011) and Ber Moti (Motiber, about 2,205). Two integrated cement works here run their own limestone mines, captive power plants and jetties, and they generate the area’s demand for transport yards, bagging and maintenance workshops, staff housing and roadside services. A second railway, from Vayor to Lakhpat, is now moving from approval to land acquisition.

The cement works and mineral leases of western Abdasa
SiteOperatorWhat is there
Sanghipuram (Motiber / Ber Moti village)Sanghi Industries, under Ambuja Cements (Adani) since Aug 2023About 2,700 ha site; 6.6 MTPA clinker and 6.1 MTPA cement; 130 MW captive power; captive jetty; stated plans to reach 15 MTPA
Sewagram Cement Works (Vayor area)UltraTech, acquired from Jaypee in 2014About 4.8–5 MTPA cement, 55–57 MW captive power, captive jetty and desalination plant; exact revenue village not confirmed
Bentonite leases (e.g. Daban, Nani Balachod)Various lease-holdersMining and processing that drive trucking and storage demand

For industrial buyers who are not farmers, the usual routes are already-converted NA land or agricultural land bought under Section 89A of the Kutch Area Act for a genuine industrial use — see buying industrial land in Kutch.

Sanghipuram: a 2003 plant at Motiber with its own port

Sanghi Industries built its plant at Motiber in 2003, and the works township is known as Sanghipuram. Limestone reaches the kiln on a conveyor of about 3 km from the company’s mines, and the company describes marine limestone reserves of about a billion tonnes. An environmental clearance granted in 2018 allowed expansion to 8.6 MTPA of cement and 7.5 MTPA of clinker; we have not confirmed that it was built. Ambuja took control in 2023 and announced an amalgamation in December 2024, and in April 2026 APSEZ said the group would expand the Sanghipuram captive port to handle vessels of 8,000 DWT.

UltraTech’s Sewagram works

Sewagram began as a 2.4 Mt Jaypee plant inaugurated in December 2009. When UltraTech acquired it in 2014, the package included the 4.8 Mtpa plant, a 57.5 MW coal-fired power plant, limestone for more than 90 years and a captive jetty at Sewagram. The plant sits at about 23.43°N, 68.71°E. We have not found a document naming Sewagram’s revenue village or confirming its taluka, though it is generally described as being in the Vayor area of Abdasa — so a parcel “near Sewagram” needs its own village and survey number checked.

The July 2026 gazette notice for land in Vayor

On 3 July 2026 the Gazette of India carried G.S.R. 565(E), a notice under Section 20A of the Railways Act declaring the intention to acquire 13,666 sq m (about 1.37 ha) of private land in Vayor for the Vayor–Lakhpat via Koteshwar broad-gauge line, which the notice puts at 66.70 km. The schedule lists six survey numbers — 219/p1, 124, 146/p23, 121/p2, 121/p1 and 121 — and objections were to be filed within 30 days with the competent authority, the Prant Officer, Abdasa.

In October 2026 Western Railway invited EPC bids for the Vayor–Lakhpat line and for Deshalpar–Hajipir–Luna, with bids due on 9–10 February 2027 and a completion period of 913 days; treat any opening date as indicative. The earlier Naliya–Vayor link had its own Section 20A notice, reportedly dated 19 October 2023 with a further notice in January 2024.

Buying near Vayor? Check the railway schedule first

Before paying an advance on any Vayor parcel, compare its survey number with the July 2026 gazette schedule and ask the Prant Office whether later notices have followed. Land on the alignment is headed for acquisition; land beside a future station or siding may gain access. Pull the 7/12 on AnyROR to confirm the survey number and its sub-division.

Wind, solar and the bustard grasslands near Vayor

The cement belt is close to the Naliya grasslands, the core of the bustard priority area described above. A wind or solar project near Vayor is possible only if the parcel is confirmed to lie outside the priority area, so run the same coordinate check before treating coastal Abdasa land as energy land.

Broad gauge reaches Naliya — and is heading for Jakhau and Lakhpat

  • Bhuj–Naliya gauge conversion (101.24 km) was inaugurated in October 2024.
  • Naliya–Vayor (24.65 km) is a new broad-gauge line; reports conflict on whether it is finished, so treat it as under way.
  • Naliya–Jakhau Port (24.88 km) was approved in November 2025.
  • Vayor–Lakhpat and Desalpar–Hajipir–Luna (81.771 km) were approved at the same time. Approval reports gave Vayor–Lakhpat as 62.686 km; the 2026 gazette describes a 66.70 km route via Koteshwar.
  • The stated purpose is moving limestone and bentonite, along with strategic needs — so land near future stations and sidings is worth watching once alignments are published.

Farmland in Abdasa: who may buy and what to ask

“Farm land for sale in Abdasa” is one of the more common Kutch farmland searches. Two points matter. First, only an agriculturist can buy agricultural land in Kutch without Collector permission (Section 89 of the Kutch Area Act), which our non-farmer buying guide explains. Second, the restrictions reported from the bustard ruling concern power infrastructure rather than farming, but only lines of 11 kV and below may be newly strung inside the priority area — so ask how a farm’s power supply reaches it.

Water is the other question. Groundwater in western Kutch is often saline, and the Gundiyali desalination plant in Mandvi taluka, meant to supply drinking water to Abdasa and Lakhpat among others, was still under construction in February 2026. Test the well. More on farmland across the district is in our agricultural land hub.

Lakhpat: lignite, Narayan Sarovar and the end of NH 41

North of Abdasa, Lakhpat is Kutch’s far western taluka (62,552 people in 2011), about 134 km from Bhuj. Its namesake town is an 18th-century fort with walls about 7 km long at the mouth of Kori Creek; it lost its role as a port after the 1819 earthquake changed the course of the Indus. Today the taluka’s land story is mining, a wildlife sanctuary and the border.

Lignite mines and power stations

GMDC mines lignite at Mata no Madh and Umarsar; its older Panandhro mine, worked since 1974, is reported exhausted. The lignite feeds GMDC’s Akrimota Thermal Power Station (2 × 125 MW at Nani Chher, running since 2006). GSECL’s Kutch Lignite station at Panandhro still runs two 75 MW units after retiring its two oldest units around 2021.

New limestone for cement

GMDC’s upcoming Lakhpat–Punrajpur limestone mine has two 40-year supply contracts: 250 million tonnes to JK Cement (January 2025) for a greenfield integrated plant, and 150 million tonnes to City Gold Pipes / Goldcrest Cement (May 2025), whose plant targets March 2027. We have not confirmed construction progress on either. If they proceed, expect demand for contractor, logistics and housing land around them.

Narayan Sarovar Sanctuary and its eco-sensitive zone

The Narayan Sarovar (Chinkara) Wildlife Sanctuary covers 444.23 sq km, cut in 1995 from 765.79 sq km to leave out mineral-rich land. An eco-sensitive zone of up to 2.5 km surrounds it, inside which commercial mining, saw mills and polluting industries are prohibited. NH 41 ends at Narayan Sarovar, so pilgrimage traffic supports roadside hospitality — but measure a parcel’s distance from the sanctuary boundary first.

Koteshwar, Sir Creek and border-area caution

Koteshwar is a pilgrimage site where BSF jurisdiction towards Sir Creek begins, and the BSF is present along Kori Creek. Some Gujarat border areas are notified for visitor permits, but we have found no rule that specifically bars land sales in Lakhpat. Ask the Collector, Bhuj before committing. Road access is improving: an upgrade of NH 754K from Lakhpat through Khavda to Dholavira (165.58 km, two lanes with paved shoulders) was sanctioned in March 2026.

Map: Abdasa & Lakhpat

Open in Google Maps

Frequently asked questions

Can I set up a solar or wind project near Naliya?

Only if the land is outside the Supreme Court’s 740 sq km priority area, or the project fits its limits. Inside the area, no new wind turbines, no solar plants above 2 MW and no new overhead lines above 11 kV are allowed. Check the parcel against the December 2025 judgment’s maps first.

How do I find out if a survey number is inside the bustard priority area?

Turn the survey boundary into coordinates, overlay them on the maps annexed to the 19 December 2025 judgment, and get a written answer from the Forest Department. Do not rely on a seller’s or broker’s word either way.

Does Jakhau have a commercial port?

Jakhau is a Gujarat Maritime Board fair-weather lighterage port, closed in the monsoon, and a large fishing harbour. A 24.88 km Naliya–Jakhau Port railway line was approved in November 2025.

Is private land in Vayor being acquired for the Lakhpat railway?

Yes. A Gazette of India notice of 3 July 2026 under Section 20A of the Railways Act declared the intention to acquire about 1.37 ha of private land in six Vayor survey numbers for the Vayor–Lakhpat line, with objections to the Prant Officer, Abdasa. Check any Vayor survey number against that schedule before buying.

Can industry be set up near Narayan Sarovar?

Not mining, saw mills or polluting industry inside the sanctuary or its eco-sensitive zone, which extends up to 2.5 km from the boundary. Measure the parcel’s distance from the boundary before buying.

Is lignite still mined in Lakhpat?

Yes. GMDC mines lignite at Mata no Madh and Umarsar, which supplies the Akrimota power station. The older Panandhro mine is reported exhausted.

Are there restrictions on buying land near the border in Lakhpat?

We have found no specific rule barring land sales, but the area is close to Sir Creek, the BSF is present, and some border areas need visitor permits. Check with the Collector, Bhuj and the relevant agencies before buying.