Tuna Tekra · Anjar taluka
Land near Tuna port: what the Tuna Tekra container terminal means for land in Kutch
Land near Tuna port means land in the hinterland of Tuna Tekra, where Deendayal Port Authority and DP World–NIIF are building a container terminal of about 2.19 million TEU a year, with completion targeted for 2027. The terminal itself sits on the creek mouth on port land; the private land market is inland, around Tuna village (Anjar taluka) and further inland towards Meghpar Borichi, Varsamedi and Adipur. Most coastal parcels here are saline mudflat or mangrove fringe, so CRZ status — not distance to the berth — decides what can be built.
Facts last reviewed on
Tuna, Tekra and Vandi: sorting out the place names
Tuna is a village in Anjar taluka and an old port of Cutch State — historically Anjar’s outlet to the sea. A narrow-gauge Tuna–Anjar railway was laid in 1900–01, carried its first train in 1905 and was extended to Bhuj in 1908; it no longer exists. Tuna faded once Kandla was chosen as the main port.
Tuna Tekra is the port site “off Tekra near Tuna”, out at the creek mouth, where Deendayal Port Authority has developed its newer terminals. Vandi is not a separate Census 2011 village; directories group it as a gram panchayat with Tuna and the hamlets of Aambapar, Bita Valadiya and Mitha Pasvariya. Tuna village had about 5,114 residents in 1,007 households over roughly 1,216 ha in 2011.
Anjar, not Gandhidham, for the records
Although the port is run from Kandla, Tuna is in Anjar taluka. Revenue records (7/12, 8A, mutation entries) for Tuna-side land sit with the Anjar taluka offices. For the wider taluka — Varsamedi, Bhimasar and the Welspun belt — see our Anjar page.Two terminals, a third berth and three different timelines
| Project | Status | Key facts |
|---|---|---|
| Adani Kandla Bulk Terminal (AKBTPL) | Operating since 2015 | Environmental and CRZ clearance granted to Kandla Port Trust in Nov 2011, transferred to AKBTPL in Nov 2014 under a BOOT concession. Reached by a 2 km rubble-mound road, 1.7 km on piles and bridges over three creeks. |
| Mega container terminal (DP World with NIIF, via Hindustan Infralog) | Under construction — about 45% physical progress reported in March 2026 | Environmental and CRZ clearance reported in March 2020; concession signed January 2023 on a 30-year BOT basis; about ₹4,244 crore; 2.19 million TEU a year; completion targeted for February 2027. |
| Multipurpose cargo berth | Not awarded | Planned for about 18.33 million tonnes a year; DPA has re-floated the PPP tender more than once and no award has been confirmed. |
The container terminal is the one that changes the land picture. Its 1,100 m berth (extendable to 1,375 m) is designed for ships of 18,000 TEU and more — which would make Tuna Tekra a mainline container gateway rather than a feeder berth.
Targets, not certainties
February 2027 is the official completion target. Large port projects often commission in phases, and the volumes that reach 2.19 million TEU a year will build up over several years. Plan any land purchase on today’s access and approvals, and treat the terminal’s ramp-up as upside rather than a date to bank on.The new road over bridge and why its alignment matters
Today the bulk terminal is reached by a 5 km road from “Zero Point” to its main gate, with creek bridges further out. In March 2026 the Centre approved a ₹472 crore road over bridge with a creek bridge as the main road link for the container terminal and the planned multipurpose berth. Its route and the villages it will cross have not been published.
- Until the alignment is notified, nobody can say which parcels will gain frontage on the new approach — be wary of listings that claim it.
- Any land acquisition for the link would be notified in the gazette with survey numbers; check those notices before buying near the likely corridor.
- A rail link to Tuna has been mentioned in port planning documents, but its status could not be confirmed. Do not price in rail access.
- Further inland, six-laning of the Kandla–Mundra section of NH 41 was reported approved in October 2026, and the NH 341 four-lane from Bhimasar towards Bhuj has been in commercial operation since September 2025.
Container traffic and the land it pulls inland
A container terminal on this scale typically needs far more land behind it than on the quay. Once Tuna Tekra is working, demand is expected for:
- Container freight stations for customs clearance, stuffing and de-stuffing.
- Empty-container depots and container repair yards for shipping lines.
- Trailer parking and truck terminals, with workshops and fuel, to absorb peak-hour port traffic.
- Warehousing for import cargo that is cleared and then distributed by road.
- Offices and housing for terminal staff, customs brokers and transport firms.
We could not verify any CFS, logistics park or salt works at Tuna or Vandi today, so this is a market still forming. The established logistics belts that will feed the terminal are a little inland:
| Belt | Distance | What is there now |
|---|---|---|
| Tuna village and its gram panchayat | Closest | Agricultural and saline land; no verified logistics facilities yet |
| Meghpar Borichi / Adipur (Anjar taluka, now in Gandhidham Municipal Corporation) | About 10 km to Adipur Jn | Adipur Jn station, Galpadar Road industrial belt, Accuracy Shipping’s head office |
| Varsamedi (Welspun City) | About 22 km | Welspun textiles, steel and DI pipe plants — see Varsamedi |
| Mithi Rohar (Gandhidham taluka) | Kandla side | Existing CFS, warehousing and GIDC belt — see land near Kandla Port |
| Bhimasar (Anjar) | About 32 km | NH 41 / NH 341 junction and Ratnamani’s pipe plant — see Bhimasar |
For a comparison of warehouse sites across Kandla, Mundra and Tuna, see warehouse land in Kutch.
Mudflats, mangroves and the clearance conditions at Tuna
The Tuna coast is creek, mudflat and mangrove. The port projects here were cleared with explicit environmental conditions: the bulk terminal’s clearance requires mangrove plantation of more than 1,000 ha (250 ha has been done at Sach Saida bet), and its approach was built partly on piles with bridges over three creeks to keep tidal flow open. Tuna, Rampar and Vira are named as the terminal’s CSR villages.
- Mangroves and mudflats fall in CRZ-IA, where new industry is generally not allowed.
- Along tidal creeks the no-development zone is 50 m or the width of the creek, whichever is less.
- The relaxation that lets port works sit on the waterfront applies inside notified port limits only — not to private land next door.
- Land behind the creeks can still be low-lying and saline, and the coast is cyclone-exposed. Check plinth levels and monsoon drainage, and plan for piped water rather than groundwater.
Before committing to any coastal or creek-side parcel, get a high-tide-line and CRZ demarcation by an MoEFCC-authorised agency and compare it with the coastal zone management plan through the Collector. Our industrial buying guide sets out the other approvals.
Buying ahead of 2027 without betting on the timetable
- 1
Check the land category first
Much land around Tuna is agricultural. A non-farmer cannot buy it under Section 89 of the Vidarbha Region and Kutch Area Act, 1958; a genuine industrial project can use Section 89A, with notice to the Collector. See our guide for non-farmer buyers.
- 2
Plan the NA route
Logistics use needs NA permission, applied for online through iORA. Confirm whether the parcel falls under a development authority’s zoning. Our NA conversion guide explains the steps.
- 3
Map the parcel against the creeks
Get the CRZ and high-tide-line position before paying any advance; on this coast it rules out more land than anything else.
- 4
Track four milestones
Container terminal commissioning, the road-over-bridge alignment, an award for the multipurpose berth, and progress on the NH 41 six-laning. Each one changes which parcels are useful.
Owners of land in Tuna, Vandi or the nearby Anjar villages who are thinking of selling can tell us about the parcel; we share it with logistics and industrial buyers looking at this side of Kandla Creek.
Map: Near Tuna Tekra
Open in Google MapsFrequently asked questions
When will the Tuna Tekra container terminal start operating?
Completion is targeted for February 2027; physical progress was reported at about 45% in March 2026. Treat the date as a target — ports usually open in phases and volumes build up over time.
Is Vandi a separate village from Tuna?
Not in Census 2011. Vandi appears in directories as a gram panchayat grouped with Tuna and nearby hamlets, so there is no separate population figure for it. Check the village name on the 7/12 extract of any parcel.
Which taluka office holds land records for Tuna?
Anjar taluka. Even though the port is administered from Kandla, revenue records for Tuna-side land are maintained in Anjar taluka and can be viewed on AnyROR.
Is there a CFS or logistics park at Tuna yet?
We could not verify one at Tuna or Vandi. Existing CFS and warehousing capacity is mainly on the Kandla and Mithi Rohar side; demand near Tuna is expected to grow as the container terminal opens.
Will the new Tuna Tekra road link pass through private land?
Its route has not been published. The ₹472 crore road over bridge with a creek bridge was approved in March 2026; any land it needs would be notified with survey numbers in the gazette.
Is there still a railway to Tuna?
No. The Tuna–Anjar line opened in 1905 and no longer exists. A new rail link has been mentioned in planning documents but is not confirmed; the nearest stations are Adipur Jn and Gandhidham Jn.
Related pages
Locations
Anjar & Varsamedi
Welspun’s home taluka — NH 41/NH 341 junction land, pipe-mill belts, GIDC Anjar and Narmada-command farms.
Locations
Near Kandla Port
Port-authority leases, Kandla SEZ units, CFS yards and NH 141 frontage around Deendayal Port.
Guide
Warehouse land
Godown, CFS and container-yard land around Kutch’s ports, rail line and highway junctions.
Locations
Varsamedi
Welspun City’s home village: textile, steel and DI pipe plants with fresh clearances, between Anjar and Gandhidham.
Guide
Industrial land
Seven industrial belts compared, plus the three legal routes to an industrial site in Kutch.
Guides
Industrial land playbook
From site criteria to registration: the land routes, checks and approvals for an industrial project in Kutch.
Buying or selling land in Near Tuna Tekra?
Tell us what you need. We work with landowners, brokers and industrial buyers across every taluka of Kutch.