Land near Mundra Port comes in three forms. Inside the Adani Ports and SEZ (APSEZ) area — a notified multi-product SEZ of about 7,900 ha plus a working Free Trade Warehousing Zone — land is leased by the developer, never sold freehold. Outside it, industrial and warehouse buyers look for private NA land in Mundra taluka villages and along the Mokha (NH 41), Mundra–Bhuj and Bhadreshwar roads, or apply for a plot at GIDC Bhadreshwar, the only Kutch estate offered in every GIDC allotment round of 2025–26. Coastal, forest and grazing land around the port is the main trap, so each survey number needs a tenure and CRZ check first.
Facts last reviewed on
Mundra town, the Mundra-Baroi municipality and 59 villages
Mundra is the headquarters of a coastal taluka of 1,53,219 people (2011) spread over 59 villages; Mundra census town itself counted 20,338, up from 12,931 in 2001. In August 2020 the State decided to merge the Mundra and Baroi gram panchayats into the Mundra-Baroi Municipality, a civic body of roughly 60,000 people by the state’s estimate.
No development authority — so the Collector decides NA
Unlike Gandhidham or Bhuj, Mundra has no notified area or urban development authority that we could find. Outside the SEZ, conversion of farmland goes to the Collector through iORA, and building permission comes from the municipality or gram panchayat; inside APSEZ, the SEZ Development Commissioner and Customs run their own regime. See the NA conversion guide.| Village | Population | What drives interest |
|---|---|---|
| Baroi | about 14,954 | Now inside the Mundra-Baroi municipality; town extensions and housing |
| Tunda | about 12,471 | Tata Power’s 4,000 MW Mundra UMPP |
| Samagoga (Samaghogha) | about 7,704 | Jindal SAW’s pipe plant |
| Jarpara (Zarpara) | about 7,352 | Orchards, a gauchar dispute and a planned bypass |
| Bhadresar (Bhadreshwar) | about 4,552 | GIDC estate, OPG power station, coastal land |
| Dhrab (Dhrub) | about 3,281 | In the 2026 SEZ expansion; GIDC Dhrub name |
| Navinal | about 3,100 | Copper smelter site and the grazing-land case |
| Shiracha (Siracha) | about 1,879 | Copper smelter site; 2025 public hearing |
| Mokha | about 777 | Gives its name to the NH 41 toll plaza |
APSEZ by the numbers: notified, developed and still vacant
Adani Ports and SEZ holds about 18,000 ha in all around Mundra, of which the notified multi-product SEZ is only a part. Notified on 21 September 2016 at 8,481.28 ha, the SEZ has shrunk through three partial de-notifications — the latest, on 11 February 2025, removed 333.74 ha of the electronics manufacturing cluster — leaving 7,900.44 ha.
| Use | Approved (ha) | Developed (ha) | Vacant or under development (ha) |
|---|---|---|---|
| Industries and port back-up | 3,731.47 | 1,227.25 | 2,504.21 |
| Supporting infrastructure | 2,909.81 | 2,305.22 | 604.59 |
| Total | 6,641.28 | 3,532.48 (53%) | 3,108.80 (47%) |
You lease SEZ land from the developer; you do not buy it
About 2,500 ha of industrial and port back-up land inside the SEZ was still undeveloped in March 2026, but none of it is sold freehold. Units take allotted or sub-leased parcels — APSEZ markets sizes from about 1 acre to over 500 acres — and need unit approval under the SEZ Act. Our industrial land guide compares the SEZ, GIDC, NA and Section 89A routes.APSEZ has a developed textiles cluster and a Mega Food Park, with chemicals, FMCG, logistics, heavy engineering and plastics clusters planned; MPSEZ Utilities is the deemed power distribution licensee inside the zone. Shared utilities lag behind: on 31 March 2026 the 150 MLD desalination plant cleared in 2014 had not been started, and only one 2.5 MLD module of the effluent treatment plant was running.
Free Trade Warehousing Zone, CFS yards and bonded storage
A “warehouse in Mundra” is either bonded space inside the zone or a shed on private land outside it. The Mundra FTWZ, about 168 ha by APSEZ’s figure, is built and operating; Steinweg Sharaf holds a 25-acre parcel there, and K-Indev opened a 68,000 sq ft closed warehouse in it in 2026. Operational SEZ warehousing and CFS units also include Empezar Logistics, Fast Track CFS, Safal Logistics, OWS Warehouse Services, Rudraksh Terminal and Adani’s own warehousing and container terminals.
Logistics firms that want to own their yard look at NA land along NH 41 towards Mokha and on the Bhuj and Bhadreshwar roads. Trailer movement, drainage and highway-access checks are covered in our warehouse land hub.
Who already operates inside the Mundra SEZ
| Sector | Operational units |
|---|---|
| LNG and gas | GSPC LNG (regasification), Gujarat State Petronet LNG, Mundra LNG, Adani Total Gas |
| Chemicals | Dorf Ketal Chemicals, Gujarat Credo Alumina Chemicals, Oriental Carbon & Chemicals, Jesons Techno Polymers, Mundra Oil |
| Engineering, food, paper | Thermax Babcock & Wilcox Energy, JNK India, Britannia Industries, Hehong Paper |
| Textiles | MITAP (Mundra Integrated Textile & Apparel Park), Ahlstrom Munksjö Fibercomposites, Skaps Industries, Terram Geosynthetics |
| Energy and civic | Adani Power Mundra, Adani LPG Terminal, Adani Hospital Mundra, the airstrip, ITI-Mundra (Government of Gujarat) |
Still under construction on the same list: Mundra Petrochem, Adani Container Manufacturing, the Mundra Crude Oil Terminal, new container and bulk terminals, and units such as Shital Metallics, Borochemie and Audax Protective Fabrics. Kutch Copper and Adani’s solar manufacturing are not SEZ units on this list; they sit elsewhere in the APSEZ area under their own clearances.
Copper, power, PVC and pipes: the plants behind Mundra’s land demand
| Plant | Where | Status |
|---|---|---|
| Kutch Copper (Adani Enterprises) | Siracha and Navinal, within APSEZ | First 0.5 MTPA phase commissioned March 2024; cleared for 1.0 MTPA, full scale expected around FY29 |
| Mundra Petrochem PVC complex | APSEZ notified industrial area | 2,000 KTPA PVC with caustic soda, carbide and a cement line, cleared 2022; construction under way in March 2026 |
| Tata Power Mundra UMPP | Near Tunda | 4,000 MW (5 × 800 MW), commissioned 2012–13 |
| Adani Power Mundra | Inside the SEZ | Thermal plant of about 4,620 MW |
| Adani solar manufacturing | Mundra | About 4 GW of cells and modules and a 2 GW ingot-wafer line (2024–25) |
| Jindal SAW | Samaghogha | LSAW pipe plant since 2004; ductile-iron pipe project |
| PCBL carbon black | Reported close to Kundrodi | About 2 lakh tonnes a year plus specialty lines |
The PVC clearance names 15 study-area villages the company must adopt, from Tunda, Kandagara, Shiracha, Navinal and Jarpara to Deshalpar and the two Bhujpurs — and several lie across the line in Mandvi taluka. Ancillary units, transport yards and workers’ housing are therefore competing for private land well beyond the port gate.
The 1,576.81 ha expansion cleared on 19 February 2026
On 19 February 2026 the Ministry of Environment, Forest and Climate Change gave APSEZ an environmental and CRZ clearance for a further 1,576.81 ha industrial park/SEZ in twelve parcels across eight villages: Siracha, Navinal, Dhrub, Mundra, Baroi, Goarsama, Luni and Bhadreshwar. The public hearing was held on 27 March 2025 on the Shiracha–Navinal road, where residents of 14 villages objected that their cattle graze this land.
| Use | Hectares | Share |
|---|---|---|
| Industries | 799.49 | 50.7% |
| Green / open space within CRZ | 235.40 | 14.9% |
| Transport (road, runway, rail corridor) | 196.46 | 12.5% |
| Utilities | 159.50 | 10.1% |
| Green belt outside CRZ, drainage and social infrastructure | 185.96 | 11.8% |
Permitted sectors are engineering, textiles and apparel, plastics, wood products, thermal plant expansion, a commercial airport, CFS and warehousing, mixed clusters and effluent treatment, supplied by a modular 66 MLD desalination plant. About 3,000 direct and 10,000 indirect jobs are expected once it runs.
Forest land, with Stage II still pending
The clearance records that the park land is forest land, mostly Prosopis scrub. Stage I forest clearance came on 16 November 2018 and Stage II was still under process; parts of the parcels fall in CRZ IA, IB, III and IV. None of it is open to private buyers. What it offers you is demand next door — labour housing, transport yards and ancillary units on private NA land in the same villages.Siracha, Navinal, Dhrub, Zarpara and the other port-edge villages
Each of these villages mixes SEZ, forest, gauchar and private survey numbers, so a village name alone tells you little about a parcel. Pull the 7/12 and mutation history on AnyROR and confirm it is private revenue land before talking terms — the title check guide lists the papers.
Siracha (Shiracha)
A small village that now hosts the Kutch Copper smelter (shared with Navinal) and lies near Adani Power’s plant. In 2008 the government gave about 1,096 ha in Tunda, Shiracha and Navinal, largely salt-pan land, to the SEZ, so much of its coastal side is outside private hands. A 5.1 km Deshalpar–Siracha road is in the 2026 four-laning package.
Navinal and the grazing-land case
Navinal’s gauchar was allotted to Mundra Port in 2005 and has been in court since a 2010–11 PIL. On 4 July 2024 the State ordered 108 ha resumed and the High Court directed recovery; the Supreme Court stayed that, and in its judgment of about 5 February 2026 set the High Court order aside because the company had not been heard, sending the matter back to the State with status quo in the meantime. Grazing land here is common land in live litigation, not something anyone can sell.
Dhrub (Dhrab) and Zarpara (Jarpara)
Dhrab, spelt Dhrub in APSEZ papers, is an expansion village; GIDC also lists a Dhrub estate (44.92 ha and 148 plots, all allotted, in 2016-17 data), most likely here, though we have not confirmed its taluka. Zarpara is orchard country — dates, chikoo and mango — where villagers made the panchayat cancel a 2008 resolution handing about 400 ha of gauchar to the SEZ. The Mundra–Jarpura–Kandagara–Dhrab road and a Jarpura bypass are in the 2026 road package.
Baroi, Luni, Goarsama, Kundrodi and Tunda
Baroi, about 1.6 km from Mundra, is now municipal land. Luni and Goarsama are expansion villages, and Luni gets a 4.1 km four-lane stretch of the Mundra–Luni–Vadala road. Kundrodi, between Anjar and Mundra and about 10–15 km from the port, has the PCBL carbon black plant and Chromeni Steels reported nearby. Tata’s UMPP is described as at Tunda-Wandh, but census tables put Vandh in Mandvi taluka, so check the revenue map before assuming a taluka for nearby parcels.
Bhadreshwar: a new GIDC estate, a lignite power station and a Jain tirth
Bhadreshwar (Bhadresar) is a coastal fishing village of about 4,552 people, PIN 370410, at roughly 22.91°N, 69.90°E — about 27 km from Mundra town, 1 km from the sea, and about 25 km from Mundra Port and 48 km from Kandla by OPG’s reckoning. It is also a pilgrimage centre for the Vasai Jain temple, rebuilt after 2001, near the Lal Shahbaz dargah and the Duda stepwell.
GIDC Bhadreshwar: the one Kutch estate still allotting
GIDC lists Bhadreshwar under its Bhuj regional office as a “General (Industrial – non chemical)” estate and names it among its new estates. It was advertised in September 2025, November 2025 (10–24 Nov), May 2026 (11–25 May) and July 2026 (13–27 Jul), and in each state-wide round it was the only Kutch estate on offer.
GIDC’s FY 2026-27 rate page shows two categories — industrial plots up to 3,000 sq m, and other plots — both marked “Tentative”, which suggests terms are not final. The estate’s area and plot count are not published in anything we found. Apply online during an advertised window on the GIDC portal; our GIDC plots guide explains lease terms and use deadlines.
OPG Power Gujarat
OPG’s 2 × 150 MW lignite-and-coal station has run since February 2015. The NGT stayed it in 2012 until forest and CRZ approvals were in place and later upheld the amended conditions, after several cases by residents.
Three kinds of land at Bhadreshwar
| Option | Tenure | Fits | Watch for |
|---|---|---|---|
| GIDC Bhadreshwar plot | 99-year GIDC lease | Engineering, fabrication, food and other non-chemical units | Chemical processes excluded; tentative plot categories |
| Private revenue land outside APSEZ parcels | Freehold after NA conversion | Yards, warehouses, larger or custom-sized units | CRZ and intertidal land; Section 89 if still agricultural |
| APSEZ expansion land in the village | Forest land being diverted to APSEZ | Not available to private buyers | Where the 2026 parcels meet neighbouring survey numbers |
A 150 MLD industrial desalination plant near Bhadreshwar was proposed by an industry body in July 2026 — only a proposal, so plan on today’s water supply.
Mokha and the Mundra–Gandhidham and Mundra–Bhuj corridors
Mokha, a small Mundra-taluka village, lends its name to the Mokha toll plaza at km 44.5 of the 71.4 km Gandhidham (Kandla)–Mundra Port stretch of NH 41, still labelled NH 8A in toll listings. The concession road links Gandhidham, Anjar, Gundala and Bhujpur. We have not confirmed that the plaza sits inside Mokha’s revenue boundary, and we found no GIDC estate there.
With the port to the south, Bhuj to the north and Kandla to the east, this stretch suits container yards, truck terminals, warehouses and labour housing on NA land. The Centre approved six-laning of the Kandla–Mundra NH 41 corridor on 15 October 2026, but reported package lengths do not reconcile, so confirm alignment, service roads and access permission with NHAI before paying for frontage. North of the port, the Mundra–Bhuj state highway (about 51–53 km) runs towards Bhuj.
| Road | Length |
|---|---|
| Mundra–Jarpura–Kandagara, chainage 19–39 | 20 km |
| Mundra–Jarpura–Kandagara–Dhrab | 5.5 km |
| Deshalpar–Siracha | 5.1 km |
| Mota Kandagara road | 4.5 km |
| Mundra–Luni–Vadala | 4.1 km |
| Jarpura bypass | 3.3 km |
A port railway and a new airport
- Rail: a private broad-gauge line of about 54–57 km from Adipur, worked by Indian Railways under a 2002 agreement, runs double-stack container trains towards the Western Dedicated Freight Corridor.
- Air: the airstrip inside the SEZ began scheduled Star Air flights on 23 June 2026 on a 1,900 m runway, to cities including Mumbai, Goa, Surat and Bengaluru.
- Port: operating since October 1998, Mundra was the first Indian port to handle over 200 million tonnes in a year (200.7 MMT in FY 2024-25).
Creeks, mangroves and court orders along the Mundra coast
The port sits on the Kotdi, Baradimata, Navinal, Bocha and Mundra (Juna Bandar) creek systems and is crossed by seasonal rivers including the Khari, Nagmati, Phot, Bhukhi and Dhaneshwari. A mapping study commissioned by APSEZ put mangrove cover in the creeks at 2,094 ha in 2011 and 2,501 ha in September 2023. The record of disputes is long: show-cause notices over Bocha island and Navinal creek in 2012, a 2013 High Court halt to SEZ work for want of clearance, and a Navinal–Zarpara PIL later moved to the NGT.
- 1
Map the parcel against shore and creeks
Near the Gulf, a creek mouth or tidal flats, get a High Tide Line and CRZ demarcation; mangroves and mudflats cannot be built on.
- 2
Compare it with the 2026 expansion parcels
In the eight expansion villages, check whether a future runway, rail corridor or green belt will be your neighbour.
- 3
Rule out gauchar, forest and salt-pan leases
Common and government land around Navinal, Siracha and Zarpara is not for sale, and some of it is in court.
- 4
Design for wind and shaking
Mundra is in Seismic Zone V on a cyclone-exposed coast; sheds and plants must be designed for both.
Date palms and orchard villages inland
Inland, Mundra taluka is horticulture land. Sardarkrushinagar Dantiwada Agricultural University runs its Date Palm Research Station at Mundra, now with a date-processing unit. Kachchhi Kharek dates carry a GI tag; most Kutch palms are seedling-grown and picked at the khalal stage in June and July. Orchards are agricultural land — only an agriculturist may buy them under Section 89 of the Kutch Area Act, while a company needs NA land or the Section 89A industrial route. See who can buy farmland.
Owning land in a Mundra village
Port-side buyers run their own surveys, so a clean 7/12, the mutation trail, a CRZ demarcation for coastal land and any NA order get you a faster answer. If your land is near Mokha, Bhadreshwar, the Bhuj road or an expansion village, tell us about it and we will check it against the SEZ, forest and coastal constraints before showing it to buyers.
Map: Mundra & Mundra Port
Open in Google MapsFrequently asked questions
Which villages are covered by APSEZ’s February 2026 expansion clearance?
Siracha, Navinal, Dhrub, Mundra, Baroi, Goarsama, Luni and Bhadreshwar — 1,576.81 ha in twelve parcels. The land is forest land, and Stage II forest clearance was still pending when the clearance was issued.
How much of the Mundra SEZ is still undeveloped?
APSEZ reported about 2,504 ha of industrial and port back-up land vacant or under development on 31 March 2026, within its 6,641.28 ha 2014 clearance area. It is all leased by the developer, not sold.
Is there a free trade warehousing zone at Mundra?
Yes. The Mundra FTWZ, about 168 ha, is built and operating, with units such as Steinweg Sharaf and Kerry Indev. Space there is leased; buyers wanting their own warehouse land look at NA parcels outside the zone.
What did the Supreme Court decide about Navinal’s grazing land?
In February 2026 it set aside the High Court’s order to recover 108 ha of Navinal gauchar from the port company and sent the matter back to the State. Status quo continues, so that land is not available to anyone.
Who approves NA conversion in Mundra if there is no development authority?
The Collector, Kachchh, on an iORA application. The Mundra-Baroi municipality or the gram panchayat handles building permission, and APSEZ land follows the SEZ regime.
When can I apply for a plot at GIDC Bhadreshwar?
Only during an advertised GIDC allotment window; Bhadreshwar was offered in September and November 2025 and in May and July 2026. Watch the GIDC portal for the next round.
Is NH 41 near Mokha being widened?
Yes. Six-laning of the Kandla–Mundra corridor, which passes the Mokha toll plaza, was approved in October 2026. Confirm alignment and access permission before buying frontage.
Related pages
Guide
Industrial land
Seven industrial belts compared, plus the three legal routes to an industrial site in Kutch.
Guide
Warehouse land
Godown, CFS and container-yard land around Kutch’s ports, rail line and highway junctions.
Guides
GIDC plots in Kutch
How GIDC allots plots, the Kutch estates on record, and when private NA land is the better fit.
Locations
Mandvi
Historic ship-building port — CRZ-bound beach land, orchards at the canal tail and a small GIDC estate.
Locations
Bhuj & Madhapar
District headquarters — BHADA-zoned city plots, NRI-driven Madhapar and project land on the Khavda road.
Guides
Industrial land playbook
From site criteria to registration: the land routes, checks and approvals for an industrial project in Kutch.
Buying or selling land in Mundra & Mundra Port?
Tell us what you need. We work with landowners, brokers and industrial buyers across every taluka of Kutch.